Business
22.01.2022 01:41
151
159
6
Solved by an expert

Moral Hazard Question 1. An entrepreneur has to decide between two projects, a safe

Moral Hazard Question 1. An entrepreneur has to decide between two projects, a safe project and a risky project. The safe project gives a return of 150 with probability 100%. The risky project gives a return of 240 with probability 50% and a return of zero with probability 50%. The investment required for both projects is 100. Assume risk neutrality (decisions based only on expected returns) and limited liability for the borrower (in bankruptcy, the borrower is not responsible for paying a loan in full). Suppose the entrepreneur did not save and he has to borrow the whole 100 from the bank. The interest rate is 10% Required:
a. Calculate the expected return to the safe project.
b. Calculate the expected return to the risky project.
c. Which project will the entrepreneur choose?
d. Suppose that a collateral equal to 75 is required of borrowers. The interest rate is still 10%. Calculate the expected return to the safe project with the collateral.
Show Answers
janny48
janny48
4,7(31 marks)

I believe the correct choice is #4...

Popular Questions about the subject: Business

Refers to a kind of job commitment deriving from the employee’s sense of obligation...
Business
11.08.2021 10:02
Explain a communication module .​...
Business
04.10.2021 13:29
During 2018, matti conner, president of maggert company was paid semimonthly...
Business
12.05.2021 23:15

New questions by subject

(1+x)=3+x El resultado porfa...
Mathematics
19.08.2020 12:27
Help I don’t understand...
Mathematics
08.07.2021 16:30
Your friend Gandalf asks if you can give him a ride home for winter break....
Social Studies
26.07.2020 08:52
The recording industry has changed dramatically in the past decade with new...
Computers and Technology
06.03.2022 06:48
What was D-Day? a) the invasion of japan b) the beginning of World War 2 c)...
Social Studies
09.06.2022 00:02
#
#
#
#
# #

We expand our knowledge with many expert answers